Dairy Flat Aeropark Lifestyle Estate
Dairy Flat Aeropark is a lifestyle development, with lots from 3500 to 4500 m². Each lot will have its own access to the custom built taxi-way leading to the North Shore Aero Club, and hangers will be built alongside the taxi-way.
Earthworks comprising a total of 150,000 m³
Work commenced on Tuesday 22nd October 2013 and was completed 31st January 2014
Aeropark Crew –
L – R Jacob Russell (Site Supervisor),
James Leach, Jed Wilson, Paul Watson, Michael Murphy, Adam Karena
Silt Pond – Conforming to TP90 Specifications
-
-
Silt Pond 1 facing West. Capacity 1,500 cubic metres, which is capable of treating up to 5 hectares of water run-off. 31.10.2013
-
-
Contaminated water run-off leading to Silt Pond 1.
31.10.2013
-
-
Silt Pond 1 showing level spreader covered in cloth. Flock shed (to right of photo) containing system to allow silt to settle at the bottom of the silt pond. 31.10.2013
-
-
Photograph showing spill-way with level spreader which is necessary to stabilise and prevent scouring of silt pond walls. 31.10.2013
-
-
Concrete manhole and floats. Any excess water from adverse weather conditions will divert into the concrete manhole and then be diverted out into existing clear water drain. 31.10.2013
-
-
Silt Pond 1 complete with full safety fencing.
31.10.2013
-
-
Removing unsuitable clay material to stock pile. This will be re-used to cap the lime rock in preparation for sub-soil drainage which will be installed in this area. 31.10.2013
-
-
Preparation of house sites – Kobelco SK40 loading Komatsu HA400 dumptruck with unsuitable material. 27.11.2013
Removing unsuitable material to allow sub-soil drainage to continue to the top of the fill.
-
-
Komatsu HA400 dumptruck (40 tonne pay load) tipping unsuitable material ready for spreading, conditioning and compaction 27.11.2013
-
-
Finished Level – Taxiway – 8.01.2014014
-
-
8.01.2014
-
-
Looking towards taxi-way – 8.01.2014
-
-
Scrapers cutting down to level – 8.01.2014
-
-
Looking towards silt pond – 23.01.2014
-
-
Looking towards SH1 – 23.01.2014
-
-
23.01.2014
-
-
Access road looking North towards Wilks Road
11.02.2014
-
-
Access road looking South towards Silt Pond11.02.2014
-
-
Emergency runway – 23.01.2014
-
-
Emergency runway – to be leveled – 23.01.2014
-
-
Site of new access road.
23.01.2014
-
-
New access road running along tree line 11.02.2014
-
-
New access road cut to level 11.02.2014
-
-
New access road cut to level 11.02.2014
-
-
Earthworks nearing completion runway to centre of photograph, silt pond to far left – 11.02.2014
-
-
Earthworks nearing completion – runway to left of photograph 11.02.2014
-
-
Earthworks completed 31.01.2014
-
-
Earthworks completed 31.01.2014
-
-
Earthworks completed 31.01.2014